糖心vlog官网观看

Introduction to Activity on Arrow

Video placeholder
Loading...
View Syllabus

Skills You'll Learn

Construction Management, Work Breakdown Structure, Timelines, Resource Allocation, Probability & Statistics, Project Schedules, Scheduling, Construction, Project Management Software, Lean Methodologies, Project Risk Management

Reviews

4.8 (2,260 ratings)

  • 5 stars
    79.73%
  • 4 stars
    17.25%
  • 3 stars
    2.30%
  • 2 stars
    0.30%
  • 1 star
    0.39%

GV

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

TG

Apr 11, 2022

E鈥媥cellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

From the lesson

Activity on Arrow

Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

Taught By

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore our Catalog

Join for free and get personalized recommendations, updates and offers.